Baths

This is a typical basement bathroom of an inner-city townhome. This bathrrom job required a complete gutting.
^

bathrooms-3--before

Before

This is a typical basement bathroom of an inner-city townhome. This bathrrom job required a complete gutting.

The customer wanted an industrial look, so opted to leave all pipes exposed, but painted. This also saved space. The stainless steel shelf and exposed joist ceiling and glass-block windows all lend themselves to the industrial look.
^

bathrooms-4--after

After
This job took: 180 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

The customer wanted an industrial look, so opted to leave all pipes exposed, but painted. This also saved space. The stainless steel shelf and exposed joist ceiling and glass-block windows all lend themselves to the industrial look.

bathrooms-1--before
^

bathrooms-1--before

Before

bathrooms-2--after
^

bathrooms-2--after

After

This circa 1970's bathroom was in serious need of remodeling. We gutted the bathroom, installed new fixtures, toilet, tub, tile, lighting and more.
^

bathrooms-1--before

Before

This circa 1970's bathroom was in serious need of remodeling. We gutted the bathroom, installed new fixtures, toilet, tub, tile, lighting and more.

bathrooms-2--after
^

bathrooms-2--after

After
This job took: 160 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

Old sink, toilet, tile...
^

bathrooms-3--before

Before

Old sink, toilet, tile...

New sink, toilet, tile, paint...
^

bathrooms-4--after

After

New sink, toilet, tile, paint...

Old shower, tub, and shelving.
^

bathrooms-5--before

Before

Old shower, tub, and shelving.

New shower, tub, and cabinet.
^

bathrooms-6--after

After

New shower, tub, and cabinet.

This bathroom remodel was so intense it could be considered new construction. The customer received a new custom shower, ceramic tiling, and custom window work.
^

bathroom-construction-01

Before

This bathroom remodel was so intense it could be considered new construction. The customer received a new custom shower, ceramic tiling, and custom window work.

The completed new bathroom, including shower with multiple specialized showerheads.
^

bathroom-construction-02

After

The completed new bathroom, including shower with multiple specialized showerheads.

Multiple specialized showerheads and an adjustable hieght, removable massage and rain head showerhead.
^

bathroom-construction-03

After

Multiple specialized showerheads and an adjustable hieght, removable massage and rain head showerhead.

Adjustable massage head showerhead.
^

bathroom-construction-04

After

Adjustable massage head showerhead.

Due to space constraints, it was required that a window be in the shower. To prevent leaking or damage to the window we installed a custom miniature shower door (made by others) allowing maintenance, cleaning, and ventilation.
^

bathroom-construction-05

After

Due to space constraints, it was required that a window be in the shower. To prevent leaking or damage to the window we installed a custom miniature shower door (made by others) allowing maintenance, cleaning, and ventilation.

The custom-made window 'shower door' open.
^

bathroom-construction-06

After

The custom-made window 'shower door' open.

Custom concrete curb and poured shower pad.
^

bathroom-construction-07

After

Custom concrete curb and poured shower pad.

The customer asked for ceramic tile flooring.
^

bathroom-construction-08

After
This job took: 180 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

The customer asked for ceramic tile flooring.

Installed a new jetted bathtub from rough in through completion.
^

bathroom-construction-09

Before

Installed a new jetted bathtub from rough in through completion.

The gray tile and block-glass windows really accomplished the more industrial look that the customer desired.
^

bathroom-construction-10

After
This job took: 120 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

The gray tile and block-glass windows really accomplished the more industrial look that the customer desired.

In this renovation we framed up a new knee wall, installed a corner jetted tub, and installed ceramic tile.
^

bathroom-finish-01

After

In this renovation we framed up a new knee wall, installed a corner jetted tub, and installed ceramic tile.

We also installed a new vanity, countertop, and backsplash to match the new tub.
^

bathroom-finish-02

After

We also installed a new vanity, countertop, and backsplash to match the new tub.

bathroom-finish-05
^

bathroom-finish-05

After

bathroom-finish-04
^

bathroom-finish-04

After
This job took: 120 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

bathroom-remodel-03
^

bathroom-remodel-03

Before

This customer had special accessibility needs, so we installed grab bars over the toilet.
^

bathroom-remodel-04

After

This customer had special accessibility needs, so we installed grab bars over the toilet.

In order to convert this half-bath into a full-bath, we utilized the closet from the adjoining room.
^

bathroom-remodel-05

Before

In order to convert this half-bath into a full-bath, we utilized the closet from the adjoining room.

As you can see, we installed grab bars in the show as well.
^

bathroom-remodel-06

After

As you can see, we installed grab bars in the show as well.

bathroom-remodel-01
^

bathroom-remodel-01

Before

bathroom-remodel-02
^

bathroom-remodel-02

After
This job took: 120 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

In this bathroom remodel, we retiled the floor, walls, and tub shower. The customer requested a land-line by the toilet as well as an exhaust fan. We restored the doorknob and keyhole and painted the door. We painted the walls and modified and installed shutters to the window.
^

bathroom-remodel-16

After
This job took: 180 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

In this bathroom remodel, we retiled the floor, walls, and tub shower. The customer requested a land-line by the toilet as well as an exhaust fan. We restored the doorknob and keyhole and painted the door. We painted the walls and modified and installed shutters to the window.

bathroom-remodel-16a
^

bathroom-remodel-16a

Before

bathroom-remodel-16b
^

bathroom-remodel-16b

After
This job took: 80 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

This 1980's-style bathroom was in desparate need of updating.
^

bathroom-remodel-17

Before

This 1980's-style bathroom was in desparate need of updating.

bathroom-remodel-18
^

bathroom-remodel-18

After
This job took: 80 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.