Tile

This customer wanted the receptacle box and two switch boxes consolidated into one 3-gang box. She also wanted under-cabinet lights and a tile backsplash.
^

electrical_-tile-1--before

Before

This customer wanted the receptacle box and two switch boxes consolidated into one 3-gang box. She also wanted under-cabinet lights and a tile backsplash.

electrical_-tile-2--after
^

electrical_-tile-2--after

After

tile-1--after
^

tile-1--after

Before

tile-2--after
^

tile-2--after

After

On this end of the countertop we also added a receptacle and a switch for all of the under-cabinet lights.
^

electrical_-tile-3--before

Before

On this end of the countertop we also added a receptacle and a switch for all of the under-cabinet lights.

electrical_-tile-4-after
^

electrical_-tile-4-after

After
This job took: 20 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

tile-3--after
^

tile-3--after

Before

tile-4--after
^

tile-4--after

After

This customer could see the bottom of the center cabinet while using the sink. She didn't like the unfinished appearance. She also wanted under-cabinet lighting and a tile backsplash.
^

electrical_-tile_-cabinetry-1--before

Before

This customer could see the bottom of the center cabinet while using the sink. She didn't like the unfinished appearance. She also wanted under-cabinet lighting and a tile backsplash.

electrical_-tile_-cabeinetry-2--after
^

electrical_-tile_-cabeinetry-2--after

After
This job took: 20 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

This customer wanted a window in the shower, a new tub, and tile surround.
^

windows_-tile-1--before

Before

This customer wanted a window in the shower, a new tub, and tile surround.

windows_-tile-2--after
^

windows_-tile-2--after

After
This job took: 20 hours (tile only)
Disclaimer: Hours for this type of project are approximate as jobs vary.

Here we are installing a marble foyer transitioning to a Pergo hall to the garage.
^

tile-1--before

Before

Here we are installing a marble foyer transitioning to a Pergo hall to the garage.

tile-2--after
^

tile-2--after

After
Customer is refinishing handrail

tile-3--before
^

tile-3--before

Before

tile-4--before
^

tile-4--before

After

tile-5--before
^

tile-5--before

Before

tile-6--after
^

tile-6--after

After
This job took: 20 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

This customer wanted a tile foyer area just inside her basement door to keep dirty shoes from soiling her carpet.
^

tile-5--after

After
This job took: 10 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

This customer wanted a tile foyer area just inside her basement door to keep dirty shoes from soiling her carpet.

This shower was created from scratch including the custom pour basin and curb.
^

ceramic-tile-01

After

This shower was created from scratch including the custom pour basin and curb.

This is a seven-piece porcelain tile surround.
^

ceramic-tile-02

After

This is a seven-piece porcelain tile surround.

ceramic-tile-03
^

ceramic-tile-03

After
Paint was done by others

ceramic-tile-04
^

ceramic-tile-04

After

ceramic-tile-05
^

ceramic-tile-05

After

ceramic-tile-06
^

ceramic-tile-06

After

ceramic-tile-07
^

ceramic-tile-07

After

ceramic-tile-08
^

ceramic-tile-08

After

ceramic-tile-09
^

ceramic-tile-09

After

ceramic-tile-10
^

ceramic-tile-10

After

ceramic-tile-11
^

ceramic-tile-11

After

ceramic-tile-12
^

ceramic-tile-12

After

ceramic-tile-13
^

ceramic-tile-13

After
This job took: 30 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

This customer wanted a simple four by four ceramic tile backsplash to prevent cooking splatters on the wall.
^

backsplash-01

Before

This customer wanted a simple four by four ceramic tile backsplash to prevent cooking splatters on the wall.

backsplash-02
^

backsplash-02

After
This job took: 12 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

glass-block-04
^

glass-block-04

After
This job took: 30 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

bathroom-tile-01
^

bathroom-tile-01

After

Here we created to niches for shampoo bottles.
^

bathroom-tile-02

After

Here we created to niches for shampoo bottles.

bathroom-tile-03
^

bathroom-tile-03

After

We created this custom shower bench.
^

bathroom-tile-04

After

We created this custom shower bench.

glass-block-07
^

glass-block-07

After
This job took: 50 hours (not including glass block)
Disclaimer: Hours for this type of project are approximate as jobs vary.

Here we have an eight-piece ceramic tile tub surround.
^

glass-block-02

After

Here we have an eight-piece ceramic tile tub surround.

Blended with a glass-block window.
^

glass-block-03

After
This job took: 50 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

Blended with a glass-block window.

bath-tile-01
^

bath-tile-01

After

bath-tile-02
^

bath-tile-02

After

bath-tile-03
^

bath-tile-03

After

bath-tile-04
^

bath-tile-04

After
This job took: 40 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

This is a slate patio with a custom drain and curb with porcelain tile.
^

patio-tile-01

After

This is a slate patio with a custom drain and curb with porcelain tile.

patio-tile-02
^

patio-tile-02

After

patio-tile-03
^

patio-tile-03

After

patio-tile-04
^

patio-tile-04

After

patio-tile-05
^

patio-tile-05

After
This job took: 80 hours (including concrete labor)
Disclaimer: Hours for this type of project are approximate as jobs vary.

tile-stoop-1
^

tile-stoop-1

Before

tile-stoop-2
^

tile-stoop-2

After
This job took: 18 hours (tile only)
Disclaimer: Hours for this type of project are approximate as jobs vary.