Concrete / Masonry

Removed abandoned alarm box, ground out old joints, and repointed.
^

concrete--masonry-1--before

Before

Removed abandoned alarm box, ground out old joints, and repointed.

concrete--masonry-2--after
^

concrete--masonry-2--after

After
This job took: 10 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

Pressure wash, grind, repoint.
^

concrete--masonry-3--before

Before

Pressure wash, grind, repoint.

concrete--masonry-4--after
^

concrete--masonry-4--after

After
This job took: 10 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

Cracks like this present trip hazards and detract from the asthetics of your home.
^

concrete--masonry-1--before

Before

Cracks like this present trip hazards and detract from the asthetics of your home.

concrete--masonry-2--after
^

concrete--masonry-2--after

After
This job took: 4 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

A compression fitting burst, causing flooding in the bathroom and floor below.
^

concrete-floor-01

Before

A compression fitting burst, causing flooding in the bathroom and floor below.

The customer decided to replace all waste and supply lines, which were burried in the original concrete floor.
^

concrete-floor-02

Before

The customer decided to replace all waste and supply lines, which were burried in the original concrete floor.

Plastic installed just before concrete poured.
^

concrete-floor-03

During

Plastic installed just before concrete poured.

New concrete floor was poured level with the old tile.
^

concrete-floor-04

During

New concrete floor was poured level with the old tile.

Trouling out the new concrete.
^

concrete-floor-05

During

Trouling out the new concrete.

concrete-floor-06
^

concrete-floor-06

During

We installed new tile over the original tile as well as the new concrete portion.
^

concrete-floor-07

After

We installed new tile over the original tile as well as the new concrete portion.

concrete-floor-08
^

concrete-floor-08

After
This job took: 80 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

We excavated the entire driveway to install a new concrete driveway and retaining wall.
^

driveway-1

Before

We excavated the entire driveway to install a new concrete driveway and retaining wall.

driveway-2
^

driveway-2

After
Disclaimer: Larger jobs are bid individually and not by the hour.

Weeds growing through cracks like this create continuous work throughout your summer. Without poisoning our Bay with weed killer, fix the problem once and for all.
^

sidewalk-repair-01

Before

Weeds growing through cracks like this create continuous work throughout your summer. Without poisoning our Bay with weed killer, fix the problem once and for all.

sidewalk-repair-02
^

sidewalk-repair-02

After
This job took: 1 hour
Disclaimer: Hours for this type of project are approximate as jobs vary.

Cracked sidewalks present a tripping hazard.
^

sidewalk-repair-03

Before

Cracked sidewalks present a tripping hazard.

sidewalk-repair-04
^

sidewalk-repair-04

During

sidewalk-repair-05
^

sidewalk-repair-05

During

sidewalk-repair-06
^

sidewalk-repair-06

After
This job took: 6 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

Settling gaps like this allow water to penetrate and freeze. This can cause even more damage to your porch and steps. Preserve your investment before it's too late.
^

step-repair-1

Before

Settling gaps like this allow water to penetrate and freeze. This can cause even more damage to your porch and steps. Preserve your investment before it's too late.

step-repair-2
^

step-repair-2

After
This job took: 2 hours
Disclaimer: Hours for this type of project are approximate as jobs vary.

We accomplished three tasks in this project. Notice that the steps are tilted to the right because they have settled. Also notice that there are four rises and they are well over 8 inches each, which can be challenging to climb. This customer also wanted porcelain tile on the treads and rises.
^

stoop-repair-01

Before

We accomplished three tasks in this project. Notice that the steps are tilted to the right because they have settled. Also notice that there are four rises and they are well over 8 inches each, which can be challenging to climb. This customer also wanted porcelain tile on the treads and rises.

We chemically anchored galvanized lag bolts to give the new concrete something to adhere to.
^

stoop-repair-02

During

We chemically anchored galvanized lag bolts to give the new concrete something to adhere to.

Then we calculated the new rise of 7 inches, thus giving us one additional tread.
^

stoop-repair-03

During

Then we calculated the new rise of 7 inches, thus giving us one additional tread.

stoop-repair-04
^

stoop-repair-04

During

Forms in place, ready to pour concrete.
^

stoop-repair-05

During

Forms in place, ready to pour concrete.

stoop-repair-06
^

stoop-repair-06

During

stoop-repair-07
^

stoop-repair-07

After
This job took: 48 hours